Ground up residential development in Los Angeles built by Red Stag Construction

Real Estate Development Services in Los Angeles, CA

From an empty or underused lot to a finished, permitted building: feasibility, entitlements, design team, budget and construction under one licensed builder.

Start your quote.

License 964664
Est. 2011
Los Angeles Based
100+ Projects
5-Star Rated · 47+ Reviews

Development services cover everything between owning a property and holding the keys to a finished building. We test what the lot allows, put real construction numbers on it, assemble the architect and engineers, carry the project through planning and plan check, and then build it.

In Los Angeles a development manager typically charges 3% to 5% of total project cost, separate from the construction contract. Soft costs such as design, engineering, permits and fees usually add 20% to 30% on top of construction cost. Red Stag has been a licensed California general contractor since 2011, license #964664, so the budget in your feasibility study comes from the company that will be held to it.

What development services include

01

Feasibility study

Zoning, height, setbacks, floor area, parking, hillside or coastal overlays and utility capacity, turned into a clear answer: what can be built here, roughly what it costs and how long it takes.

02

Due diligence before you buy

During escrow we review the survey, title exceptions, soils conditions, slope, methane zone status and existing permits, so surprises show up before your deposit goes hard.

03

Design team

We bring in and coordinate the architect, structural and civil engineers, soils engineer, surveyor and energy consultant, with one schedule and one budget they all design to.

04

Entitlements and permits

Applications, hearings where they are required, plan check corrections and agency clearances with Los Angeles City Planning and the Department of Building and Safety, or your local city.

05

Budget and lender package

A development budget covering land, soft costs, construction, financing and contingency, with the schedule of values and cash flow a construction lender needs.

06

Construction and closeout

We build the project as the general contractor, or manage it for a stated fee, through final inspection, Certificate of Occupancy and handover.

Who uses development services

Property owners with more land than house

A large lot, a teardown or a property that qualifies for a lot split. You want to know if adding units or rebuilding makes financial sense before you spend on drawings.

Investors and family offices

You have the capital and want a local builder to find the constraints, set the budget and deliver the building while you stay out of the daily detail.

Buyers in escrow

You have a short contingency period and need a builder to tell you what the lot will really support and what the site work will cost.

Architects and brokers

You need construction pricing and constructability input for a client early, before the design is fixed or the offer is written.

Typical development costs and fees in Los Angeles

These are common market ranges for the Los Angeles area, shown so you can sketch a budget. Real numbers depend on the lot, the product and the approvals required. Your proposal states our fee in writing before any work begins.

ItemTypical rangeWhat it covers
Feasibility study$3,500 to $15,000 fixed feeDepends on lot complexity and the number of options studied. Often credited if we go on to build.
Development management fee3% to 5% of total project costCovers managing the design team, entitlements, budget and reporting. Separate from the construction contract.
Soft costs20% to 30% of construction costArchitecture, engineering, soils, survey, permits, school and utility fees, insurance and financing costs.
Ground up custom home construction$450 to $850+ per square footOur 2026 Los Angeles benchmark. Hillside foundations, basements and high end finishes push past the top of the range.
ADU construction$185,000 to $425,000+Our 2026 Los Angeles benchmark for garage conversions through detached new units.
Project contingency5% to 10% of construction costRaise it to 10% to 15% for hillside lots, older structures and sites with unknown soils.
  • Total project cost means land, soft costs, construction, financing and contingency added together.
  • Entitlement time is a cost. Every month in planning carries loan interest, taxes and insurance, so it belongs in the budget from day one.
  • These figures are for budgeting. They are not financial or investment advice, and returns on any project depend on the market when you sell or lease.

From lot to finished building

  1. 1

    Feasibility

    We study the zoning and the site and give you a written summary with a buildable program, a rough cost range and a timeline.

  2. 2

    Concept and budget

    The architect produces a concept. We price it by trade. You decide whether to proceed with numbers in front of you.

  3. 3

    Entitlements and design

    Planning approvals where they are required, then full construction drawings and engineering, priced again at each milestone so the budget holds.

  4. 4

    Permits and financing

    Plan check, agency clearances and trade bidding run in parallel. Your lender receives the budget, schedule and contract it needs to close the loan.

  5. 5

    Construction

    We build with daily supervision, weekly reports and monthly cost updates through final inspection and Certificate of Occupancy.

Los Angeles rules that shape what you can build

SB 9 lot splits and duplexes

California Senate Bill 9, in effect since January 2022, lets many single family lots be split in two or built with two homes through a ministerial process. Eligibility depends on the lot, hazard zones and owner occupancy rules, so it has to be checked parcel by parcel.

Accessory dwelling units

State ADU law allows a detached ADU and a junior ADU on most single family lots and has removed many local barriers. For a lot of owners it is the fastest way to add a rentable unit.

Small lot subdivisions

The City of Los Angeles Small Lot Subdivision Ordinance allows fee simple townhome style homes on lots zoned for multifamily or commercial use, each on its own small parcel.

Hillside, coastal and methane overlays

Hillside lots fall under the Baseline Hillside Ordinance. Property in the coastal zone can need a coastal development permit. Parts of the city sit in mapped methane zones that require testing and mitigation under the slab. Each one changes cost and schedule.

Development Services questions

A development manager runs a project on the owner’s behalf from feasibility to completion: zoning review, budget, design team, approvals, financing paperwork and construction oversight. The owner keeps ownership and makes the major decisions.
Plan on construction cost plus 20% to 30% in soft costs, a 5% to 10% contingency and financing costs. Ground up custom homes in our 2026 benchmarks run $450 to $850+ per square foot for construction alone.
A by right single family home commonly takes 4 to 8 months to design and permit and 10 to 16 months to build. Projects that need a planning hearing, a coastal permit or a subdivision map can add 6 to 18 months before construction starts.
Possibly. The lot generally must be in a single family zone, outside certain hazard and historic areas, and meet minimum size rules after the split. We check your specific parcel as part of a feasibility study.
We provide these services for property owners, investors and their design teams. You own the project. We manage it and build it.
The property address or parcel number, what you hope to build, your target budget and any survey, title report or soils report you already have.

Start with the address

Send us the property address and what you have in mind. We will tell you what we would look at first and what a feasibility study for that lot would cover.

Related

Provide Details to Begin