Construction Management in Los Angeles, CA

One licensed builder running your budget, bids, permits, schedule and job site from the first estimate to the final inspection.

Start your quote.

License 964664
Est. 2011
Los Angeles Based
100+ Projects
5-Star Rated · 47+ Reviews

Construction management means we run the project for you. We price the drawings, bid the trades, pull the permits, build the schedule, supervise the site every working day and approve every invoice before you pay it. You keep the decisions. We carry the coordination.

In Los Angeles a construction manager usually charges 5% to 10% of construction cost on larger projects and 10% to 15% on smaller residential jobs, with preconstruction billed hourly or as a fixed fee. Red Stag has held California contractor license #964664 since 2011, so the same company that manages your project is licensed to build it.

What we manage

01

Preconstruction budget

A line by line estimate from your drawings before they are finished, so the design gets corrected on paper instead of in the field. We flag the items that move a Los Angeles budget most: foundations, shoring, utility upgrades and long lead finishes.

02

Bidding and trade contracts

We write the scope for each trade, collect at least three comparable bids where the market allows, level them so you can see what each one leaves out, and write subcontracts that tie payment to finished work.

03

Permits and inspections

Plan check submittals, corrections, clearances and inspection scheduling with the Los Angeles Department of Building and Safety or your city building department, including deputy inspections for concrete, welding and structural work.

04

Schedule

A critical path schedule built around real lead times for windows, cabinets, stone, steel and electrical gear, updated every week and shared with you, your architect and every trade on site.

05

Daily site supervision

A superintendent on site who checks layout before concrete is poured, framing before it is covered, and waterproofing before tile goes on. Photos and a written report go out every week.

06

Cost control and payments

Every change is priced and approved in writing before the work starts. Each payment request is checked against work in place, and we collect lien releases from subcontractors and suppliers with every payment.

Who hires a construction manager

Homeowners with an architect already on board

You have drawings, or you are close. You want a builder at the table now to keep the design inside the budget, then one accountable company to run the job.

Investors and small developers

You are building a duplex, a small lot project, several ADUs or a spec home and you need reliable numbers, lender draw paperwork and a schedule you can underwrite.

Owners who live out of the area

You cannot walk the site every week. We act as your eyes on the job, with photo reports, a shared budget and a single phone number.

Owners of a project that has stalled

The first contractor left, the permit expired or the budget is gone. We audit what was built, what was paid for and what it takes to finish, then take over.

Typical construction management fees in Los Angeles

These are common market ranges for the Los Angeles area. Your fee depends on project size, how complete the drawings are, site difficulty and how much risk we carry. The exact figure is written into your proposal before you sign anything.

ItemTypical rangeWhat it covers
Preconstruction services$150 to $250 per hour, or a fixed fee from about $5,000Estimating, constructability review, bid packages and schedule before permits are issued. Often credited toward the construction fee.
Construction management fee, projects above about $2 million5% to 10% of construction costWe manage and coordinate. Trade contracts can be held by you or by us.
Construction management fee, projects under about $2 million10% to 15% of construction costSmaller jobs need the same supervision, permits and paperwork, so the percentage is higher.
Cost plus with a guaranteed maximum priceCost of the work plus a 10% to 20% feeWe hold the trade contracts and guarantee a ceiling. Savings below the ceiling are returned or shared as the contract states.
Site supervision and general conditionsCommonly 6% to 12% of construction costSuperintendent, temporary power and toilets, fencing, dumpsters, site protection. Billed at cost and shown as its own line.
  • A percentage fee is calculated on the cost of the work, not on land, design fees or permit fees.
  • Carry a contingency of 5% to 10% on new construction and 10% to 15% on remodels and hillside sites, where hidden conditions are common.
  • Ask any construction manager who holds the subcontracts. If they do, they should carry the license, insurance and workers compensation for the job. We do.

How a managed project runs

  1. 1

    Site walk and document review

    We walk the property, read the drawings, soils report and survey, and tell you what we see as the main cost and schedule risks.

  2. 2

    Budget and schedule

    You get a written estimate broken down by trade and a first schedule. If the number is over your target we list specific changes that bring it back.

  3. 3

    Permits and bidding

    While the plans are in plan check we bid the trades, so contracts are ready to sign when the permit is issued.

  4. 4

    Construction

    Daily supervision, a weekly owner meeting, a weekly report with photos, and a budget update every month showing committed cost, paid to date and forecast to finish.

  5. 5

    Closeout

    Final inspections, Certificate of Occupancy where one is required, punch list, warranties, manuals, as built drawings and final lien releases handed over in one package.

What makes Los Angeles projects harder to manage

Hillside rules

The City of Los Angeles Baseline Hillside Ordinance limits grading and floor area on hillside lots, and large earth export requires a haul route approval. Both affect schedule months before a shovel hits the ground.

Utility lead times

A new or upgraded electrical service from the Los Angeles Department of Water and Power can take many months. We apply early so power is not the last thing holding up your final inspection.

Energy and stormwater requirements

California Title 24 energy rules shape window, insulation and mechanical choices. The city Low Impact Development ordinance requires many projects to capture stormwater on site, which adds planters, drywells or tanks to the site work.

Lien law

California gives subcontractors and suppliers mechanics lien rights against your property. Collecting the statutory conditional and unconditional releases with each payment is how you stay protected, and it is part of every payment cycle we run.

Construction Management questions

A general contractor usually gives one fixed price and keeps the trade pricing private. A construction manager works for a stated fee, shows you every bid and invoice, and gets involved during design. Red Stag is licensed as a general contractor and can work either way.
Typical fees run 5% to 10% of construction cost on projects above about $2 million and 10% to 15% on smaller residential work. Preconstruction is commonly billed at $150 to $250 per hour or as a fixed fee.
During schematic design, before the drawings are submitted for permit. That is when a cost estimate can still change the design cheaply. We also take over projects that are already under way.
Yes for most new homes, additions and structural remodels. We work with the architect and engineer you already have, or we can run the project as design-build under one contract.
A company that contracts to build, or that holds the subcontracts, needs a California contractor license. Red Stag holds CSLB license #964664 with B General Building, C-6 and C-36 classifications, active since 2011.
Yes. We prepare the schedule of values, monthly draw requests, progress photos and lien releases that construction lenders and their inspectors ask for.